FAQ Document_Executive Order N-7-22 (pdf)
DownloadPR Subbasin Determination Letter 1/21/2022 (pdf)
DownloadEPCWD comments to Paso Basin Land Use Planting Ordinance 11-22-2021 (pdf)
DownloadThe Paso Basin Land Use Planting Ordinance Public Review Draft has just been released. The public comment period is open from now to November 24, 2021.
Public Review Draft Planting Ordinance 10-22-21 (pdf)
DownloadHit the play button below or click on this link to view in YouTube .
(You can expand to full screen view with the button to the lower right.)
EPCWD Letter to Board of Supervisors for Item #13 05-04-2021 (pdf)
DownloadThe public comment period is open until MARCH 3, 2021 for the Paso Robles Subbasin Water Year 2020 Annual Report. Comments may be submitted to the District at info@epcwd.org no later than March 1, 2021
"Paso Robles Subbasin Stands to Lose Up to $458 Million Annually if Water Use is Reduced..." (pdf)
DownloadFiles coming soon.
Paso Robles GSP EPC Comments (pdf)
DownloadThe Paso Basin Subbasin Groundwater Sustainability Plan was submitted to the Department of Water Resources on January 30, 2020. It is available at the following link for review and comment: https://sgma.water.ca.gov/portal/gsp/preview/35
$5.50 per acre for irrigated acreage
$0.08 per acre for non-irrigated acreage
$7.50 per house
$50.00 minimum assessment
$6.00 per acre for irrigated acreage
$0.08 per acre for non-irrigated acreage
$7.50 per house
$50.00 minimum assessment
$6.00 per acre for irrigated acreage
$0.08 per acre for non-irrigated acreage
$7.50 per house
$50.00 minimum assessment
$13.00 per acre for irrigated acreage
$0.20 per acre for non-irrigated acreage
$7.50 per house
$50.00 minimum assessment
Copyright © 2018-2020 Estrella-El Pomar-Creston Water District - All Rights Reserved.
Powered by GoDaddy